Showing posts with label Plaster Process. Show all posts
Showing posts with label Plaster Process. Show all posts
Wednesday, 27 November 2013
Plaster Process
Before we could add the plaster to the clay tiles we made, we had to roll out more clay to craft walls for the clay tiles so the plaster wont leak from the clay tiles and make a mess. I rolled my walls out at a good length and then measured them up to the clay tiles to see if I had some clay left over to make another wall. After I put the walls around the tile I had to join up the walls then check the bottom to see if the plaster would not leak. After all that was done we had to make the plaster we did this by using a plaster powder and adding water to it, we would have to keep steering it to mix the powder with the water and after some steering the plasters was ready to pore into the clay tile. When the plaster dried we then got are plaster tiles and I was happy with the design it created with both my tiles
Subscribe to:
Posts (Atom)